[1]
Tus'sadiah, H. et al. 2026. EVALUATION OF PUMP MAINTENANCE PERFORMANCE USING OVERALL EQUIPMENT EFFECTIVENESS AND SIX BIG LOSSES. KOMITMEN: Jurnal Ilmiah Manajemen. 7, 2 (Aug. 2026), 80–90. DOI:https://doi.org/10.15575/jim.v7i2.58516.